← all research

SPY daily 2004-01-02..2026-08-27 (23y). Overnight = prev close -> event-day open; net @2bps round trip. All events scheduled in advance (no look-ahead).

M1. Event composite — per leg (overnight into the event day)

eventn/yrmean ONtnet/eventnet/yr (full cap)
FOMC1978.7+0.213%+4.34+0.193%+1.68%
month_end27212.0+0.018%+0.52-0.002%-0.02%
quarter_end904.0+0.102%+1.90+0.082%+0.32%
opex26611.7+0.127%+2.92+0.107%+1.26%
pre_holiday2099.2+0.058%+1.52+0.038%+0.35%

Combined union (any event night, held once if overlapping)

  • events: 867 (38.3/yr), mean overnight +0.097% (t +4.43), net/event +0.077%, net/yr (full cap) +2.94%

  • utilisation: 15.2% of sessions (~38 nights/yr)

  • corr(composite daily, SPY close-to-close) = +0.19 (the sleeve is flat ~96% of days)

M2. Book sleeve (add as 4th equal-weight sleeve)

  • sleeve standalone: ~+2.94%/yr on its own account at full capital on event nights.
  • average capital deployed: 15.19% of the year (38 nights x 1 night).
  • book contribution at equal weight (1/4): ~+0.74%/yr on book capital — the account sits idle ~85% of the time.

Verdict: capital-inefficient as a standalone book sleeve; the allocator's equal-weight would fund an account that is almost always flat.

M3. Cash overlay (run on another sleeve's idle cash)

  • incremental return on the idle cash: +2.94%/yr (+0.077%/event x 38.3 events).
  • added risk: one unhedgeable overnight gap per event, flat before the statement; the sleeve is flat the other ~85% of days, so it does not compete for capital with the host sleeve's positions.
  • cost: couples the FOMC order flow into the host account (attribution + reconciliation complexity); needs a host that holds cash on event eves.

Verdict: the capital-efficient combination — near-free return on otherwise-idle cash, no drawdown overlap. Preferred over M2.

Recommendation

  1. Keep FOMC as its own observe-first sleeve (done) for clean forward attribution.
  2. Combine at the CAPITAL level as a cash overlay (M3), not as a 4th equal-weight book sleeve (M2) — a 9-nights/yr sleeve is wasted on dedicated equal-weight capital.
  3. M1 event composite: adopt only the legs that clear cost on their own; do not dilute FOMC with the weaker calendar legs.

Time 0s.